TAC Family Forums

Share your wins, get unstuck, or see how others use the TAC Method to create a fulfilling guitar life!

  • Cadgirl

    Member
    December 4, 2022 at 4:42 am

    @That_Guy , We have 1/2 the basement remodeled, we will be entering phase II, probably not till January. We were going to do the demo before we went on vacation but then decided not to and wait till we are back. Right now, not as much dampness in the basement, but it still needs to be emptied every few days. I’ll be shutting it off completely soon. Yep, I do the same, box up my guitars for vacation. I’ll post a picture of the remodel once completed. My husband was going to hang my guitars on the wall but not sure I want to do that yet. Thanks for your comments on this. I would hate to see a huge crack down the front of my Taylor. I think i’d faint.